Our pavers have sagged and need to be lifted, filled and relaid - +- 50 sq. Metres. The concrete driveway needs to be repaired, as the levels may not match - about 35sq metres
#1 | Tradie 1 |
|
25 jobs | No longer in contact |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work