Laying of some 1,600 bricks for new garage extension to house - to match existing finish. Currently in the process of wrapping the house to get pre-wrap approval from Council, windows have been ordered and should be here and installed by the end of the September or early October ready for brick laying. However, given that there is a split between starting and finishing the brick laying for the 50% cavity inspection, it may be possible to start before the windows arrive.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
All good, one small issue was quickly repaired which was great.
Work carried out by the owner/operator
Reviewed on 12-12-2019