Published: 22 May 2018
We have a timber fence with plan 20 series ( --- ) filled concrete block posts. The end post is not in the correct position and needs to be moved approx. 800mm, as a result the next post in will need to be rebuilt to adjust for the correct angle. We are happy to do the demolition work if it helps. Bare minimum we will remove the timber sections of the fence so we can modify and re-use these sections. So we are after a price for 2 new posts in the same style, 1 new concrete block post in the correct location and 1 rebuilt in the current location just rotated to the new angle.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 25-07-2018
Partner with Builderscrack
Get work