Hi :) I'm looking to have approximately 10m2 of bricks laid in an outdoor area, the bricks are onsite now. I'm keen to have this work done as soon as possible (as always)! The job will include bricks laid at three levels - 1: near the seats, the bricks will be raised up a bit (to 400mm depth against the seats) - 2: on the walking path the bricks will be flush with the deck - 3: near the door, the bricks will need to "drop down" to allow the laundry door to open . Stormwater pipes have been installed, so the bricks will need to be graded so the water falls towards the SW pipe.
#1 | Tradie 1 |
|
28 jobs | No longer in contact |
#2 | Tradie 2 |
|
32 jobs | No longer in contact |
Partner with Builderscrack
Get work