The bricks by the gable and roof area had fallen down during the CHCH earthquake and we require to get this area repaired as per the attached photos. We require a quote for this job.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with the job he kept in contact with us if anything needed to be done.
Work carried out by the owner/operator
Reviewed on 05-05-2015
Partner with Builderscrack
Get work