Active job

Install summerhill stone sills

Job image
Job image

Job description

Alterations and Extensions
Christchurch

My 1980s Summerhill Stone home is getting double glazing installed. Bay windows are being removed and new double glaze window sets are being installed. They will be flush with the house. The work entails (1) working with the installer/manufacturer of the new window sets (2) Once windows are taken out the bricklayer will remove a course of bricks that was under the bay windows (3) install sills that the new window sets sit on (4) I have the sills to install . One kitchen window (see photo) that is being refitted already has sills, so it is an example of the job that needs to be done (see other photo). There are three bay windows to be re-silled. The time frames are in October to the beginning of November. Thanks.


Trade professionals

#1 Tradie 1
317 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo