We have two step cracks cause by earthquakes on the front outside of our 18 month old house that need the mortar replaced. The mortar needs to be replaced with matching coloured mortar to match the existing mortar colour of the bricks. The bricks are Provincial Avignon with sandstone coloured mortar. It is a two storied house but the only crack that is higher than a ground ladder height can be reached by standing on the porch roof. There are no insurance claims or EQC claims associated with this job, just a straight job.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Prompt friendly contact and he did the job within a few days with no hassle.
Work carried out by the owner/operator
Reviewed on 12-06-2013
Tradesperson reply
"thanx"
Partner with Builderscrack
Get work