Published: 11 November 2020
Hi, I have a house which is 190m2 and we need half the roof on the upstairs section of the house replaced. It is currently a Super 6 asbestos roof which need removal and the an solid insulation layer put done with ply and then asphalt shingle to match the rest of the house. I also need the asbestos removed from two small shed and a car port but these do not need to be roofed. Sam Page.
#1 | Tradie 1 | No recent reviews | 56 jobs | No longer in contact |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work