Draft/design three storey alteration. Initial work is completed. ie. Survey, existing building on site, basic concept done. At engineer stage for SED part then will need finalising. Need designer Draftsman with design flare to complete to consent stage. Basic concept is stack of cantilevered boxes over exist building.
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 |
|
22 jobs | No longer in contact |
#4 | Tradie 4 |
|
25 jobs | No longer in contact |
#5 | Tradie 5 |
|
2 jobs | No longer in contact |
#6 | Tradie 6 |
|
5 jobs | No longer in contact |
#7 | Tradie 7 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work