Published: 16 November 2022
These need to be of a standard for submission to KDCD. Unsure if I want full voluntary reclad or partial. No urgent timeframes required by steady progress preferred. Experience with voluntary reclad drawings preferred. Thanks
#1 | Tradie 1 |
|
29 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
9 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
#5 | Tradie 5 |
|
0 jobs | No longer in contact |
#6 | Tradie 6 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work