Floor deflection: The 600 mm cantilevered floor along the foundation wall on the west side of the house shows visible downwards deflection, confirmed with the spirit level and while walking over the floor. After getting access to the subfloor framing, it was confirmed that the joist spanning over the foundation wall were approximately 190x45 at 400 crs. Intention is to have piles below the edge of the wall as shown in the attached photo. We planning to use H5 treated timber piles in a concrete footing dug into the ground.