1. Grind and remove the two palm tree bulbs on driveway so that we can build a carport on it. Cut another shrub on the right as well. We will remove the retaining stones. 2. We want all the two trees on our lawn to be removed and grinded. 1 ceder tree and 1 tall tree near the fence. There are another tree stump to be grinded. 3. Clear all the bushes next to the deck and a flower plant on top of our deck (around a pole). We are building a new deck and they should not dectroy our new deck. We will remove the paddle stone over there.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
All trees are removed and stumps are grinded properly. It would be good if the chips are piped tidily instead of spreading on the ground. I need to tidy up the garden myself.
Work carried out by an employee of the company
Reviewed on 17-02-2020
Partner with Builderscrack
Get work