New building (18 months), ground level. One of a block of four. Fully wired for TV, with a connector outside. Roof installation of UHF aerial.
#1 | Tradie 1 |
|
29 jobs | No longer in contact |
#2 | Tradie 2 |
|
81 jobs | No longer in contact |
Partner with Builderscrack
Get work