This is a 2 storey block of 6 units. There are various wires hanging down from the upper level that need assessing if they are still required and removal if not required. Remaining wires need to be attached VERY neatly to the building. Unfortunately you can't see the wires in the photo but they are down the left side.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent work, well priced, a pleasure to deal with
Work carried out by the owner/operator
Reviewed on 26-05-2022
Partner with Builderscrack
Get work