TechWater Solutions

Excavation
Auckland

4.8 |
29 Reviews |
31 Jobs completed
Post Job
Share

TechWater Solutions is a potable water reticulation service provider that specialize in leak fault emergency repairs on Council water network and installs of subdivision watermains.

We technicians specialize in leaks on the water network that sprays like a mist to tap flow and burst that flows like a river to 20m geysers from roads/berms/footpath & driveways.

Our work motto is "spend 30mins to do a 5min job or spend 5mins to do a 30min job" and "do it once do it right"

We also specialize in and can do the following;

Supply and installs of watermains,
Watermain pressure testing,
Watermain super-chlorination,
Low pressure/flow testing,
Firemains installations,
PE Welding,
Burst water pipe repairs,
Excavation civil works,
Concrete saw cutting,
Concrete rock breaker,
Traffic control TMP set up level 1 roads,
Demolition works,
Underground service locator,
Leak detection,
Minor concreting works,
Minor carpentry works,
Minor reinstatement works,

Note:

What ever other job that is required outside our field of expertise we are happy to take on the task. If we are not confident then we will not request it.

What we do Asbestos, Concreting & Paving, Demolition, Electricians, Excavation, Fire Services, Landscaping, Plumbing, Arborists, Irrigation
Areas served Auckland, Franklin, Hauraki Islands, Manukau, North Shore, Papakura, Rodney, Waitakere, Kawerau, Opotiki, Rotorua, Tauranga, Western BOP, Whakatane, Hauraki, Pacific Islands, Buller, Grey, Westland, Coromandel, Waiheke Island
Business Type Company

Credentials

Accreditations
Nothing to see here at the moment.
Insurance
Crombie Lockwood SmartPAK Liability
Memberships
Nothing to see here at the moment.

Projects

Watermain Upgrade

60m of 50mm AC (asbestos cement) watermain upgraded to 60m of 125mm PE100 watermain on Council side footpath.

5 Photos

Reviews

BC Rating
4.8
Workmanship
4.8
Quality of workmanship provided

Cost
5.0
How well they kept to the quoted cost

Schedule
4.8
How well they kept to schedule

Communications
4.9
Professionalism and responsiveness

Main Water Line Move due to Tree Roots

Work carried out by the owner/operator

26th June 2022

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Drain leakage

Work carried out by the owner/operator

14th June 2022

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Urgent plumber needed for leaking pipe repair

Work carried out by the owner/operator

27th May 2022

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!