Published on 6th May 2025
We are getting a shed built currently and are installing --- l tanks on it. We need a plumber/drainlayer to "carry out the plumbing and drainage work", but are happy to dig the trenches and are for the tanks (going to be buried 500mm into the ground) and help connecting the pipework. I'm digging the holes for the soak pit and water tanks this weekend. Tanks are being delivered on the 19th.
| Workmanship |
4.0
|
| Cost |
4.0
|
| Schedule |
4.0
|
| Communications |
2.0
|
"Took a while to get the Drainage AsBuilt as requested by the council and myself, but came through in the end"
Work carried out by the owner/operator
Review posted by Jack on 20th August 2025
Verified Builderscrack review