We have subdivided our property and need services run before we can concrete back over ready for the new owner to eventually build their home. The dwelling on the subdivision hasnt been planned, but we have agreed to run the services and concrete the driveway into the new section. STORMWATER = DN 100 PVC connection to kerb WASTEWATER = DN 100 PVC connection to existing DN225 RCRRJ main WATER = DN 20 ID MDPE connection to DN100 AC watermain We are preferably would like this done by the end of the month cheers