Published: 9 October 2024
Final stage of new stormwater connection to century old house. Started in 2017 and almost completed, has been waiting on new retaining wall. Now that's in, there is a bubble up sump to install. The sump is on site, the hole is dug.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
This job was dropped by many plumbers as too challenging and not big enough to be worth the bother. Otis took it on and arrived promptly and mostly prepared. He faced the challenge heroically and we got there in the end. Otis kept his cool and kept at it.
Work carried out by the owner/operator
Reviewed on 29-10-2024