Published on 31st March 2026
I have a drainpipe in a paddock that has about 50% silt in it. The silt needs to be water blasted out of the drain, the drainpipe is about 100m long.
| Quality of work |
4.0
|
The quality of workmanship provided |
| Cost |
4.0
|
How well they kept to the quoted cost |
| Schedule |
4.0
|
How well they kept to schedule |
| Communications |
4.0
|
Their professionalism and responsiveness |
"not a 100% clear on the charges added a fuel surcharge to the invoice."
Work carried out by a subcontractor
Review posted by David on 22nd April 2026
Verified work review
Partner with Builderscrack
Get work