Install rodding point: excavate down to existing sewer line (0.5m deep), an cut out section of pipework, replacing it with 100mm pvc London junction with an upstand to the surface, and screw cap for future maintenance. Backfill area top soil and grass seed.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"We decided to install a rodding eye. I posted the job on a Friday afternoon, and within minutes received a response from Nick. His message included everything I needed to make a decision - the quote, what it covered, and when the job could be done - all at a very competitive price. Nick kept me well informed the day before the appointment and again on the day itself. The job was completed to a high standard the following Wednesday morning. Thank you for your professionalism and efficiency, Nick!"