Published on 20th August 2025
The digging has been done, we just need the drains to be laid and the connections to be made. This is for clearing water overflow from a pool, and excess rainwater in the surrounding area.
We require;
1) A 9.5m coil drain laid in a trench (already dug).
2) A 6m channel drain set in front of the house.
3) 2 x grate drains
4) All connected together and then connect to existing plumbing under the house.
5) A hot water connection laid to an above ground shower.
most, if not all digging has or will be done.
We need you to quite for materials (except above ground shower), install and connect drains. (Quote should include trench fill for the coil drain, etc..
Job can be started next week.
| Quality of work | — | The quality of workmanship provided |
| Cost | — | How well they kept to the quoted cost |
| Schedule | — | How well they kept to schedule |
| Communications |
1.0
|
Their professionalism and responsiveness |
""
Review posted by Ryan on 23rd August 2025
Verified communication review
Partner with Builderscrack
Get work