I have an area 5m x 3.5m with rock, stones and sand/soil to be removed ( see photos) Would like the area cleared (except for 1 palm tree) and excavated to about 70mm so I can put pebbles on to drive the car on. Flat back section with easy access. I would like it done before Waitangi weekend if possible
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
67 jobs | No longer in contact |
Partner with Builderscrack
Get work