We are renovating our family bathroom and require the wall above bath to be tiled along with 2 other walls and the floor. We will require work to start approx 26/7/21
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 30-08-2021
Partner with Builderscrack
Get work