1) Removal of existing tiles, 2) Potentially some leveling work required on the substrate to improve the fall as water pools in 2 places. 3) Installation of new tiles (examples as per the photo) Job needs to be completed before end-Nov.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very happy with the work completed to re-tile an external entry way. Good communication from Sean throughout the process. Would recommend.