Published on 5th December 2025
1) Two Tiles have come out in the bathroom (needs to be attached back) 2) Lay New Tiles on a Small Area Outdoor (Tiles Will Be Provided). Outdoor Area already has a concrete foundation below.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Quang was prompt with site visit and quotation. Reasonable price for a small job. Great communication, on time, did the job perfectly. Highly recommended."
Work carried out by the owner/operator
Review posted by Atish on 21st December 2025
Verified Builderscrack review
Partner with Builderscrack
Get work