New Zealand is at Alert Level 4. Please be aware only emergency works can be carried out on residential and commercial property during this time. Tradies and Homeowners can still communicate to discuss quotes and information for future jobs, as long as this is in-line with the current Alert Level 4 restrictions. More information available here.

Post job.
Choose tradie.
Easy.

With thousands of tradies across NZ, Builderscrack has your job covered

Kitchen

Job description

closed
Posted 2 weeks ago

Floor and wall tiles to be installed. Tiles supplied.
You must supply leveling screed, adhesive and grout.
Job ready to start on 20th march. Let down by another contractor so there is some urgency to complete this to avoid disruption to other trades.

Floor :
1. Lay leveling screed over underfloor heating element
2. Install ceramic floor tiles (wooden look alike) approx 5.5 sqm staggered 2mm grout.

Wall:
1. Install ceramic wall tiles 600mm high from bench on wall with sink. Subway pattern, 2mm light grey grout.
2. Install ceramic wall tiles from floor to ceiling on oven wall. Subway pattern, 2mm light grey grout.
3. approx 7 sqm

Tradespeople

Tradie #1 32 jobs Secured job
Tradie #2 25 jobs No longer in contact
Tradie #3 11 jobs No longer in contact
Tradie #4 4 jobs No longer in contact
Tradie #5 2 jobs No longer in contact
Get started now! Post your job for free and find the right tradie. Post your job for free, now!