Floor and wall tiles to be installed. Tiles supplied. You must supply leveling screed, adhesive and grout. Job ready to start on 20th march. Let down by another contractor so there is some urgency to complete this to avoid disruption to other trades. Floor : 1. Lay leveling screed over underfloor heating element 2. Install ceramic floor tiles (wooden look alike) approx 5.5 sqm staggered 2mm grout. Wall: 1. Install ceramic wall tiles 600mm high from bench on wall with sink. Subway pattern, 2mm light grey grout. 2. Install ceramic wall tiles from floor to ceiling on oven wall. Subway pattern, 2mm light grey grout. 3. approx 7 sqm
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
A well skilled tradesman and wife combination always paying attention to detail. Dakon Tiling will be my go to tiler in future. Highly recommended to others
Work carried out by the owner/operator
Reviewed on 14-05-2020
Tradesperson reply
"Thanks ."