Roughly 64m2 of tiling in total Two of the bathrooms have showers with tile walls and plastic shower trays so no nibs required. One bathroom has a built-in bath. Waterproofing is also required if you happen to do both. Job to start mid to late November
#1 | Tradie 1 |
|
175 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 28 jobs | No longer in contact |
#3 | Tradie 3 |
|
217 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 60 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 1 job | No longer in contact |
#8 | Tradie 8 | No recent reviews | 111 jobs | No longer in contact |
Partner with Builderscrack
Get work