1. Remove the two wall tiles either side of the gap under a vanity unit and replace and fill in the space with the same tiles (tiles will be supplied by me) continuing the present design. 2. Advice on kitchen tile grouting which breaks up around a few of the floor tiles. The job would need to be done in the next 6 weeks.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Steve did an excellent job and explained what was required. The job itself was not straightforward as the wall had bowed slightly.
Work carried out by the owner/operator
Reviewed on 05-02-2019
Tradesperson reply
"Thank you for your positive feedback & high 5s"
Partner with Builderscrack
Get work