On suite. Reno. New bathroom to be sealed and tiled floor to wall full walk-in shower floor and walls, large tiles. Will provide materials just need installation. Withing the next month as in early stage room still needs to b gib and prepped for tiling
#1 | Tradie 1 |
|
142 jobs | No longer in contact |
Partner with Builderscrack
Get work