Internal cistern in gym toilet replaced and wall needs new tiles installed. We can not match the tiles so will either replace whole back wall or find suitable tiles to fit gap. Tiles currently in place are 450x450mm glossy and 2 are missing. We can ask plumber to remove toilet before tiling if that helps. The gym door is open --- pm. Happy for this to fit around other jobs.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Awesome tiler. Helped us figure put what we needed to do for the repair work. Was on time and kept to budget AND did quality work. Thanks.
Work carried out by the owner/operator
Reviewed on 17-05-2021
Partner with Builderscrack
Get work