We would like our bathroom (floors and walls) tiled and under floor heating put in. It is an Initial home(thick as wood walls), with a chip board floor, so we also need to know what prep work is still required for the work to be done aside from making sure the plumbing is in place. For instance we know we need to do some waterproofing, but what that looks like we're not entirely sure. Do we need to reline the room with jib aqualine over the solid wood walls? Do we need to put something over the chip board floor? Does waterproofing happen before or after the underfooor heating goes down? Do we put the bath in before tiles/underfloor heating or just tile the whole thing then put the bath in? There will also be a bench to be tiled, which will be where the bereft and lonely maroon tiles are now, in that alcove. It's approx 3 x 2 metres. We would love to have it done fairly soon.
Workmanship |
3.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work was done on time and very well. There were some hiccups along the way but overall we are happy with the result.
Work carried out by the owner/operator
Reviewed on 14-11-2017
Tradesperson reply
"I would loved to say thanks after all. We've tried our best and willing to try to be better.."
Partner with Builderscrack
Get work