Review

Oil Change Kings - workshop floor to be tiled

Job image
Job image
Job image
Job image
Job image
Job image

Job description

Floor and Wall Tiling
Hamilton

We have a workshop area that needs to be ground and have the tiles laid. The area to be laid is around the "pit" which is 15.0m long x 7.0m wide, minus the pit which is 6.0m x 4.2m. There will be a requirement for a "ramp" trim across both ends of the workshop (7.0m length) and some transmission line trim for toilet doors etc I have allowed for tiling to go up the walls 300mm high We will supply the tiles (600 x 600 and 300 x 600) The building will be available between 15 -22 March for this work to be completed


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Good to work with, happy with the completed job, a nice guy. Would highly recommend!

Work carried out by the owner/operator
Reviewed on 24-05-2021

Tradesperson reply
"Thanks. Great customer!"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo