We need floor tiles put down in the Ensuite but first the old flooring will need to be lifted and then the floor would need to be water proofed. Ideally we would like the job to be done in the next three to four weeks.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent to deal with and excellent workmanship.
Work carried out by the owner/operator
Reviewed on 24-03-2020
Partner with Builderscrack
Get work