Hi we are renovating our spare bathroom. It requires waterproofing --- tiling with --- tiles, 4.3m2 tiling with --- tiles, screed shower base reformed with tiles and a --- recess in shower for bottles etc. We also require a 1m2 splash back to be tiled with 300x75 mm tiles in a herringbone pattern. All would need to be grouted and edged or siliconed where appropriate. Job would commence in about 2 weeks and need to be done before Christmas.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Milan was fantastic. It's hard to fault him any way. I'll definitely be using him again.
Work carried out by the owner/operator
Reviewed on 20-01-2020
Partner with Builderscrack
Get work