Take out tile and grout, around the waste drainage and put it back, once, it has been assessed. Plumber install a gully with a leak control flange.
#1 | Tradie 1 |
|
64 jobs | Secured job |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
Partner with Builderscrack
Get work