Cost estimation required for a new build on waiheke. 90% of the BC drawings has been done and ready to be costed. I also have the full 3d Model in revit if it helps with costing. Cheers. Willem
Workmanship |
3.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
3.0
|
Work carried out by the owner/operator
Reviewed on 16-04-2020
Partner with Builderscrack
Get work