we have a geotech report, according to the report, good soil is only at 1.4m deep. however, to remove all that soil and the refill it will cost quite a lot, wanting to design timber piles foundation or to seek advice on a design that is much more cost effective. thank you.
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
Partner with Builderscrack
Get work