Published: 28 November 2024
I have a gully garden with several levelled paths and sloping stonework, done with dozens of trailer loads of 100-300mm stones from local rivers. To finish the job I need another 0.5 to 1.0 m3 of stones (100-200mm) set in mortar in the ground along remaining non-edged paths plus as added course of stones on top of some existing walls. (to be done by February 2025)
Partner with Builderscrack
Get work