I need a few minor things done before final inspection for COC. I need to attached a graspable hand rail to existing deck rail. Toilet extraction fan needs the ducting connected and vented. Window scribes need to be seal and painted. I can send the inspection sheet on request.
#1 | Tradie 1 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work