This will involve attaching uprights to the side of a concrete staircase leading up to the front door, and also 1 upright to strengthen the join between the top of the stairs and an aluminium framed glass screen. I envisage 4 uprights in total with a top handrail and a side rail of continuous lengths about 2.5 metres long.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job! Would recommend to anyone.
Work carried out by the owner/operator
Reviewed on 13-04-2022
Partner with Builderscrack
Get work