Electrical work to connect and commission 5-6 JA solar panels to a Solax 3.3kw approved inverter and connect to the grid. I will physically install panels, conduit,dc fuses, circuit breaker and mount the inverter. You need to sign off on electrical work. DC work is easily accessible on garage roof. AC work inside garage next to main supply .
#1 | Tradie 1 |
|
199 jobs | No longer in contact |
Partner with Builderscrack
Get work