Active job

Level ground and prepare for shed

Job description

Garden Shed Installation
Waitakere

Small/ Medium sized shed 1.5 by 2m The shed has been assembled. It has a wooden floor but it’s facing the wrong way. No ground preparation was done whatsoever. Instead of making the most of the very gently sloping section and maximising the space between the deck and the shed in a very small backyard, it sits with the longer side across the slope. The right half of the shed sits on the flat part with the left half propped up on about 20cm stacks of wood cut offs. We want it repositioned and can provide a group of guys to move it. We would like the ground levelled and prepared before returning the shed. Not necessarily a concrete foundation but definitely something sturdy and strong I know it’s a huge ask but if this could be done before then it would be all we want for Christmas 😉 but will absolutely consider early next year


Trade professionals

Finding available tradies …

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo