Published on 18 March 2024
I require a concrete slab to be laid for a 4.8x4.2 duratuf shed. Site has been leveled and has gap 65 down ready for boxing/metal base. Access around is level and can be driven to.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Great job, quick turnaround. Stuck around and worked on to get the job done when delays out of their control came up. Thanks Reece
Work carried out by the owner/operator
Reviewed on 12 April 2024
Partner with Builderscrack
Get work