Hi, this job requires assembling a kitset greenhouse (supplied by me). The garden area is flat, but has a slight slope (as in pic) so it would require a little building up because the greenhouse needs to sit level. I would prefer it built up with a gravel base and later I can put pavers in it.
#1 | Tradie 1 |
|
106 jobs | No longer in contact |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 |
|
92 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 22 jobs | No longer in contact |
Partner with Builderscrack
Get work