Published on 28th April 2026
I have some portable steel scaffolding that has been in place for about 15 years, so that it will have rusted together, so it can't be taken apart. The scaffolding is in 3 sections (each about 1.75m, so total height is a bit over 5m). I think the scaffolding will have to be cut up to be removed. The scaffolding is rusty, so only good for scrap. The photo shows the scaffolding.
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Great job and excellent communication"
Work carried out by the owner/operator
Review posted by Sylvia on 16th June 2026
Verified work review
Partner with Builderscrack
Get work