Published on 12 December 2023
We are getting a window replaced in late January 2024 and will need a single bay of scaffolding. The height from the ground to the scaffolding deck is 2 to 3 metres, the length of scaffolding required is about 2.5 to 3 metres. It will be possible to access the scaffolding from our deck, so no ladder is required. Timing depends on availability of the glass.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
3.0
|
A friendly team, Job done professionally.
Work carried out by the owner/operator
Reviewed on 21 March 2024
Partner with Builderscrack
Get work