We want scaffold erected to allow retro fit double glazing to be installed to second story as per photos and to lower level, but on uneven ground as per photos. Job is approx 12-16 weeks away yet, thats the approx lead time for manufacture. Required for approx 2-3 days we think
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
8 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
#4 | Tradie 4 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work