Scaffold required to complete a painting job to complete the face of the very top weatherboards barge boards. The apex is at just two ends of a roof. Only needed for one day. Hoping for 6 June 2020. Areas that need to be painted shown. One end of a Plank could possibly sit on the apex of the lower roof.
#1 | Tradie 1 | No recent reviews | 9 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 |
|
77 jobs | No longer in contact |
Partner with Builderscrack
Get work