Replace lead flashing at one side of unit. Also cladding needs to be repainted and a barge board replaced. The flashing is on the side of the house (the attached next door unit is on a slightly lower level so the roof is also at a lower level). Let me know if you need more details.
#1 | Tradie 1 |
|
333 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 32 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
509 jobs | No longer in contact |
Partner with Builderscrack
Get work