The initial builder was hired to build a corrugated sunroof over the deck at the back. He did most of the work but left unfinished. Leftover task includes: complete the roof, fix the leaks and the fall for rainwater as it is back flowing at the moment through joists, and complete guttering and merge into a drainpipe.
#1 | Tradie 1 |
|
65 jobs | No longer in contact |
Partner with Builderscrack
Get work